FUTURE – PROOFED
LAB _
DESIGN

FUTURE – PROOFED
LAB _
DESIGN

T-A labs is a joint venture between Tsunami Axis and CHC LAB International, specialising in the design, manufacture, supply and installation of cutting-edge laboratory systems. Our focus lies in creating flexible, adaptable and sustainable lab environments that meet the current and future needs of those who work in them, and of those who invest in them.

ABOUT US
  • 01 CERTAINTY
  • SUPERIOR MANUFACTURING

    The products from CHC LAB are meticulously crafted, manufactured, and quality assured within our facilities. Our dedicated teams handle the installation, ensuring end-to-end project control. Each item is certified to meet the stringent requirements of both European and International standards.

    PRODUCTS
  • 02 VARIETY & CHOICE
  • TAILORED TO YOUR NEEDS

    We offer three standard bench systems crafted from stainless steel, epoxy powder-coated steel, wood-based materials, and phenolic materials. This enables us to finely calibrate both materiality and functionality, ensuring they align with your performance and budget requirements.

    PRODUCTS
  • 03 AVAILABILITY
  • EFFICIENT INSTALLATION

    Utilising CHC LAB’s automated design and fabrication methods, standard products are manufactured in volume and kept in stock. This results in an average installation time of 11-13 weeks from the point of order placement within the UK.

    PRODUCTS

GLOBAL _ CAPABILITY

Our collaboration between Tsunami Axis and CHC LAB International enables us to work seamlessly anywhere in the world to design and deliver a broad spectrum of project typologies with innovative solutions.

global presence

TA LABS OFFICES

LAB PROJECTS

OUR CLIENTS

DELIVERY_TIME

We follow a strategic manufacturing approach, operating with volume production rather than manufacturing to order. CHC’s state-of-the-art facility spans an impressive 250,000 sqft for manufacturing and an additional 100,000 sqft for storage.

With advanced automation capabilities we efficiently handle high-volume production of standard and non-standard products. Average timeframes for installation from receipt of an order is just 11-13 weeks.